Skip to main content
Medical Building

Pain Management Consultants

Project Details

  • Client
    Pain Management Consultants Medical Facility
  • Location
    7964 Summerlin Lakes Dr., Fort Myers, FL
  • Year
    2017
  • Size
    14,180 sqft

The Challenge

Cynlab Medical Offices also known as Pain Management, was an exercise in maximizing a commercial site plan. The 14,180 square foot medical facility, located at 7964 Summerlin Lakes Drive in Fort Myers, was designed on an unusually shaped lot. Backing up to Summerlin Road in Fort Myers, an enhanced buffer was required.

Pain Management Consultants Medical Facility

01 - Pain Management Consultants Medical Facility

Solution

Comprehensive Site Planning, Zoning, and Construction Observation/Inspections

Exceptional Engineering’s project development team met the client’s needs by assisting in the development of the premier office medical building. The project development team worked efficiently in providing the maximum building square footage on the challenging shaped parcel of land, and provided a design which exceeded the developer’s requested space.

Exceptional Engineering, as usual, took the lead in all aspects of design, planning and permitting. Services included, Master planning, Site Plan design, Infrastructure design, integration and concurrency satisfaction, Construction Documents, County Development Order Permitting, South Florida Water Management District (SFWMD) ERP Permitting, Lee County Utility Permitting and Final Certifications. Because of the location of the unusually shaped lot, Exceptional Engineering project managed additional necessary surface water management, drainage design, utility design, landscape architecture, construction inspection and certification. This required a specific design for a 6” gravity sewer service, 10” water main design, 2” water service design, and 6” fire main design, permitted via Lee County Utilities, Florida Department of Environmental Protection, and South Florida Water Management District. Along with the enhanced landscaping, the plan included storm water storage and a driver friendly parking lot. EEI also provided construction observations for the civil portion of the project.

  • Pain Management Consultants Medical Facility Slide 1
  • Pain Management Consultants Medical Facility Slide 2
  • Pain Management Consultants Medical Facility Slide 3

    Result

    State-of-the-art Medical Facility
    The final outcome was beautiful medical complex that utilized all aspect of the land to its maximum and ensured proper compliance for both traffic and water management.
    Pain Management Consultants Medical Facility Hero

    Would you like to know more about this project?